Esslingen
2023
Office building on the Neckar
Complete structural planning for a new five-story office building in hybrid construction.

Location
Esslingen
Completion
2023
Area
4,200 m² gross floor area
Services
Structural planning, fire protection, thermal insulation
About the project
For a new five-story office building on the banks of the Neckar in Esslingen, Kanteplan provided the complete structural design in hybrid construction: reinforced concrete cores combined with wood-concrete composite ceilings.
The Task
The client wanted a sustainable building with visible wood surfaces, flexible office spaces, and certification to a high energy standard, all within a tight schedule.
Our Solution
The hybrid construction method combines the spans and sound insulation of solid construction with the carbon footprint of timber construction. Fire protection and thermal insulation certificates were developed parallel to the structural design, keeping planning and approval on track.
The Result
A flexibly usable office building with a visible timber structure, approved without additional demands and completed within 18 months.

Further projects.
Planning a similar project?
Speak to us about your project, we bring the experience of 68 projects with us.

